Challenge
Richmond University Medical Center needed to expand and modernize critical areas of its hospital campus while maintaining operations within the existing facility. The multi-project program encompassed a new Medical Intensive Care Unit (MICU), Emergency Department and Operating Room suite, each delivered on a different schedule between 2021 and 2024.
Solution
G&T provided Project Management, Cost Management and Cost Estimating for the phased expansion. The program included a 13,500 sq ft medical intensive care unit (MICU) renovation within the existing hospital and a separate 75,000 sq ft, two-story LEED-certified building housing a 40,000 sq ft emergency department and 11 operating rooms. The emergency department incorporates more than 50 treatment spaces, a 12-bed observation unit and separate pathways for patients with different levels of acuity.
Outcome
The MICU opened in 2021, followed by the Emergency Department in 2023 and Operating Room suite in 2024. The new Emergency Department introduced a dual-track model separating acute and lower-acuity care, with more than 50 treatment spaces and a 12-bed observation unit, while the completed surgical suite expanded capacity for inpatient and ambulatory procedures.
Key Contacts
Project Location
Healthcare & Life Sciences
See more projects within this Sector
Next Project
A campus for groundbreaking science